Sun Tunnels
1/1/1978
26
Storyline
Sun Tunnels documents the making of Holt's major site-specific sculptural work. Completed in 1976, the sculpture features a configuration of four concrete "tunnels" 8 feet long and 9 feet in diameter.
- Director:
Sun Tunnels documents the making of Holt's major site-specific sculptural work. Completed in 1976, the sculpture features a configuration of four concrete "tunnels" 8 feet long and 9 feet in diameter.